#11 Bunker Rebuild

Before the storm last week that has left us with a foot of snow on the ground, we undertook the process of rebuilding the right greenside bunker on hole #11.  The sand in this bunker was heavily contaminated which contributed it to playing poorly from a golfers standpoint.  Also, the bunker was no longer draining water properly after a rain event which meant we had to phyiscally remove the water from the bunker each time it rained with a gas-powered pump.


#11 bunker with sand removed
The process of rebuilding this bunker began with removing all existing sand from the bunker.  Due to the fact that bunkers rarely are flat, removing all sand from the bunker has to be done the good, old-fashioned way...with shovels.  After shoveling all of the old sand out of the bunker we added and compacted some soil to restore the contours on the face of the bunker.  The next step was to remove all existing drainage pipe in the bunker to insure that it was not clogged.  After this we used a laser transit to grade the pea gravel in our drainage ditch to insure proper fall for drainage, then reinstalled drainage pipe and backfilled with clean pea gravel around the drain pipe.
Using transit to ensure proper drainage

The next step was to install a fiber "bunker liner" product called Sand Dam.  Currently none of the bunkers (except this one) at Milburn are lined.  The purpose of lining bunkers with this material is to keep sand from washing down the steep bunker faces in the event of heavy rainfall (not really an issue with this bunker as it is relatively gently sloped) and also to prevent underlying soil from working its way up and contaminating the sand.  Usually this contamination is a result of the daily raking process to prepare bunkers for play.  These bunker liners insure that the soil stays below and the sand stays above the liner so that they do not mix.  This keeps the sand looking and playing better for years to come.  Following placement of the bunker liner, aproximately 5000 metal staples are inserted through the liner into the soil to hold the liner in place.

Rolling out and stapling the bunker liner
Once the lining process is complete, new sand is placed in the bunker.  The sand that we use here at Milburn is sand that is dredged from the Kansas River, cleaned, and separated by particle size to meet USGA recommended specifications.  We fill the bunker to a depth of 5 inches and then use a vibratory plate compact to compact the sand to a consistent finished depth of 4 inches.  This bunker took approximately 24 tons of sand to reach this desired depth. 




Asst. Supt Greg Burdiek running plate compactor



This bunker with new sand on #11 will play somewhat "softer" than the rest of the bunkers on the course for a short period of time.  Despite employing a vibratory compactor it typically still takes a few months and few good, heavy rains to fully compact the sand.  The process will be similar for any other bunkers that are identified for refurbishment in the future. 

Steve

0 comments:

Steve Wilson, CGCS
Golf Course Superintendent
Milburn Country Club
(913) 432-0333
steve@milburn.org
The purpose of this blog is to inform on maintenance practices and golf course conditions at Milburn Country Club in Overland Park, Kansas. I hope you find the blog interesting.

Powered by Blogger.

Total Pageviews

Followers